In April 2015, light spills through an unfinished doorway as dusk settles over the ridge. A few weeks later, the camera turns toward a rainbow crossing the valley. These early photographs hold the work and the landscape together, long before the later chapters of floors and bottle glass.

First, somewhere to begin.

The owner remembers this as the first thing they built on the house: the porta-john used for a while as the work got under way. Timber framing, tools and a practical beginning on the hillside.

A person in work clothes beside unfinished outdoor timber framing around a toilet, with tools and trees nearby.
The first thing built · Spring 2015
The unfinished facade and open doorway at dusk, with warm light inside and the mountain ridge beyond.
Carpathia at dusk · April 12, 2015
A rainbow reaches across the mountain ridge toward the green valley beneath storm clouds.
A rainbow across the valley · May 30, 2015
A rainbow descends across the mountain and valley, framed by pine branches on the left.
A rainbow through the pines · May 30, 2015

Before the later chapters,
there was the view.

Before the archive turns to floors and bottle walls, it lingers on the reason for being here: clouds moving across the valley and a pine against the last light. These short recordings give the landscape its own chapter. The building work that follows takes place against that same backdrop of mountain weather and changing skies.

A wide sunset panorama from the wooded hillside, with mountain silhouettes and warm light over the valley.
A mountain evening · December 2016

A sky in motion

Clouds move across the mountain valley in a short fixed-view recording from the owner’s earlier archive.

Download MP4 ↓

Stepped earth and rock inside the unfinished house, with ladders, timber framing and a blue bucket.
The mountainside within · May 25, 2016

The last light

The sun drops behind the horizon, with a pine tree held in silhouette against the changing evening sky.

Download MP4 ↓

Making a home
in the hillside.

The archive turns toward the work: unfinished interiors, earth moved beside the house, material carried up the road and hands working together on the slope. A mountain build involves more than the work inside the walls. The delivery film below follows one of those journeys to the house, while the hillside footage brings the crew and the terrain into the same frame.

A wide interior construction view with rough walls, timber, scaffolding and light entering through the sloping windows.
Inside the work · March 2018
Earthworks beside Carpathia’s red facade, with tanks, exposed hillside and work in progress.
Working into the hillside · May 2018
A wide view of two green cisterns beside the unfinished house and earth-filled tire walls, with the wooded valley and mountains beyond.
Cisterns, tire walls & the valley

Many hands, one hillside

A group works together with a large sheet of material on the slope beside the house. The owner identifies Michael Reynolds—the Earthship “godfather”—as working on site alongside the crew. The original sound is retained.

Download MP4 ↓

The long way up

Getting materials to the house was a project of its own. On this delivery, our contractor’s truck got stuck in a ditch with Carpathia’s tank aboard. Getting the tank up to the house took the rest of the day—a reminder of the difficult access, risks and unexpected setbacks that were part of building here. The film follows the approach from another vehicle, with the original sound retained.

A large green cistern strapped onto the bed of a white pickup truck, ready for transport beneath an overcast sky.
Loaded for the trip up the mountain
Download MP4 ↓

The last cistern arrives.

Pulling into Carpathia’s driveway with the last cistern aboard. A final stretch of the mountain delivery, recorded on November 11, 2018, with the original sound.

Two large green cisterns standing beside the house on the hillside, with the valley at left and construction materials in the foreground.
The day the cisterns were first placed

A name carried
from the mountains.

Carpathia takes its name from the Carpathian Mountains in Ukraine, near where its owner was born and where his parents used to camp. Another mountain landscape became the setting for a deeply personal project.

The name also recalls RMS Carpathia, the ship that rescued survivors of the Titanic in 1912. For its owner, the house carries a sense of possibility: the hope that homes could help people live more lightly.

Garbage Warrior helped turn that idea into a reason to build. The photographs and films here follow pieces of the work, rather than a finished-house reveal.

The film behind the idea ↗

The photograph dates this archive chapter; it does not establish when the name or project began.

Carpathia’s entrance, timber and sloping glazing, photographed during construction.
July 9, 2019
Warm timber roof and open window framing above the valley, with a scaffold at right.
Light, timber and the work of making · September 28, 2021

A plan, in the owner’s hand.

A photographed plumbing sketch sits alongside the physical work: arrows, fittings and handwritten notes about how things might connect. It offers a different view of the build, following the thinking behind the pipes as well as the labor of putting them in place. Read it beside the Systems page to connect this planning stage with the later equipment and construction photographs.

Plumbing planning notes · August 2019.

A hand-drawn plumbing sketch with blue and red notes and diagrams on paper.
Plumbing planning notes · August 2019
More from the buildTHE 2019 FILM ARCHIVEOpen filmsClose films22 additional time-lapses

More moments from the work, grouped by source-file month. These archive films show construction in progress. Choose a film to play; videos load only when requested.

Working along the exterior base

Construction time-lapse.

Download MP4 ↓

Bottles set into the wall

Construction time-lapse.

Download MP4 ↓

A crew on the interior walls

Construction time-lapse.

Download MP4 ↓

Shaping the wall surface

Construction time-lapse.

Download MP4 ↓

Wall work from the scaffold

Construction time-lapse.

Download MP4 ↓

Making room inside

Construction time-lapse.

Download MP4 ↓

Reaching the upper wall

Construction time-lapse.

Download MP4 ↓

The wall, layer by layer

Construction time-lapse.

Download MP4 ↓

Building up the wall surface

Construction time-lapse.

Download MP4 ↓

Working the wall together

Construction time-lapse.

Download MP4 ↓

A small floor section takes shape

Construction time-lapse.

Download MP4 ↓

Finishing the wall surface

Construction time-lapse.

Download MP4 ↓

Another pass along the wall

Construction time-lapse.

Download MP4 ↓

The last light on a working wall

Construction time-lapse.

Download MP4 ↓

Preparing bottles for the walls

Construction time-lapse.

Download MP4 ↓

Wall work between the timber

Construction time-lapse.

Download MP4 ↓

Earthwork at the entrance

Construction time-lapse.

Download MP4 ↓

Moving earth beside the house

Construction time-lapse.

Download MP4 ↓

Materials along the hillside

Construction time-lapse.

Download MP4 ↓

A floor poured by hand

Construction time-lapse.

Download MP4 ↓

A crew around the floor pour

Construction time-lapse.

Download MP4 ↓

Finishing a fresh floor section

Construction time-lapse.

Download MP4 ↓

Watch the work become a home.

Two original time-lapses follow the floor work in 2020, compressing the repeated movements of preparing, filling and smoothing into a few seconds. Timber posts, stepped levels and the bottle-glass doorway help orient each view within the house. The bottle-wall section follows another part of that same interior, bringing the glasswork film together with photographs from across the build.

A beam makes its way home.

A beam delivery makes its way up Carpathia’s driveway, with the mountain slope on one side and the wooded valley on the other. The camera follows the truck along the approach to the house.

Exterior work area beside the house, with water tanks, a cement mixer, pipes and concrete.
Preparing for the slab pour · August 20, 2020

Placing and finishing the floor

Workers prepare, fill and smooth a floor section around an irregular timber post. The bottle-glass doorway and stepped interior connect this view to the house in the photo gallery.

Download MP4 ↓

A room floor taking shape

A recessed floor section changes from membrane and mesh to a filled, leveled surface. The fixed camera follows the work beside the timber studs and a pipe opening.

Download MP4 ↓

More from the buildTHE 2020 FILM ARCHIVEOpen filmsClose films4 additional time-lapses

More moments from the work, grouped by source-file month. These archive films show construction in progress. Choose a film to play; videos load only when requested.

Pouring the interior floor

Construction time-lapse.

Download MP4 ↓

Preparing another floor section

Construction time-lapse.

Download MP4 ↓

A floor takes shape

Construction time-lapse.

Download MP4 ↓

Smoothing the floor

Construction time-lapse.

Download MP4 ↓

Materials for
the next stage.

Eighteen 80-pound bags at a time—loaded at the store, unloaded and reloaded for the climb, then carried into this room. Every bag would be moved again when it was time to use it.

Stacked concrete mix and white bags beside blue bottle walls, tool cases on a wall ledge and a generator in the foreground.
Materials, tools & bottle walls · June 23, 2021

The house,
lit from within.

A glow across the hillside after dark makes the long glazed front read differently: the interior becomes visible from outside, with timber and bottle walls caught in the light. The photographs then move indoors, where tools, materials and tile work show the smaller tasks within the larger build. Together, the night views and close details connect the silhouette of the house to the work happening inside it.

Carpathia’s long glazed facade lit at night, with timber framing and bottle walls visible inside.
The glazing, lit from within · February 1, 2022
A frontal night view of Carpathia’s glowing windows during construction.
A light across the hillside · February 1, 2022
Tools, timber, raw-log posts and work materials inside Carpathia under temporary lighting.
Inside the evening’s work · February 1, 2022
Light shines through Carpathia’s door and bottle-glass windows at night, illuminating the work area beside the facade.
A light on at Carpathia · April 2, 2022
Dark chevron wall tile and rectangular floor tile beside unfinished wallboard, exposed framing and work lights.
Tile work in progress · September 8, 2022

Building with
bottle glass.

Blue glass takes shape around a doorway in the May 2020 film. Later photographs follow green, amber and clear glass through the work, with sunlight revealing the colors. Seen together, the wide views and close details show how these walls shape the character of a room: framing a passage, sitting beside timber and turning daylight into small circles of color.

Building the bottle wall

Workers build up blue bottle glass around the doorway beside the slanted windows. The fixed view follows the wall taking shape, with timber framing and work in progress visible.

Download MP4 ↓

Green, amber and clear bottle glass around a doorway, with scaffolding in front and exposed timber overhead.
Bottle glass taking shape · September 13, 2020
Afternoon sunlight across a green bottle-glass doorway, timber framing and visible work materials.
Afternoon through bottle glass · January 22, 2022
Raw-log posts, exposed roof framing and bottle walls beside the sloping glazing during construction.
Timber & bottle walls · February 1, 2022
Blue and amber bottle glass around a timber doorway during construction.
Light through bottle glass · April 2022
Blue, amber and clear bottle glass set around a timber doorway, with work lights and building materials beside the wall.
Blue glass around the doorway
A close view of blue and amber bottle bottoms set into pale plaster beside unfinished wall texture.
Blue & amber, up close
Sunlight shining through blue, amber and clear bottle glass around a doorway during construction.
Daylight through the bottle wall

Tile by tile.

In the later stages of the build, attention turned to smaller interior projects. Dark rectangular tiles and pale grout lines give this floor its rhythm, with the surrounding framing and walls still open as the work takes shape.

Dark rectangular floor tiles with pale grout beside exposed timber framing, plumbing and unfinished walls.
Tile by tile · The later stages of the build

The story stays open.

Beyond the glass and the work of building, there is the view: evening light across the valley, mountains on the horizon, and the landscape that gives Carpathia its setting.

The archive records moments along the way. For the systems, equipment and work still to be completed, the house has a separate record.

Walk through the photographs ↗Read the systems & records ↗
Evening light over the valley, from the owner’s June 2024 archive.
June 2024

The printed chapter.

The printed editions bring the landscape, the house and its records into a format you can read away from the screen. Choose the photograph-led magazine for a visual introduction or the white-margin edition for everyday printing. Cards and labels carry a QR link back to the full website.

Explore media & print ↗

Carpathia in photographs